Sept 30 - Oct 1, 2026

Omni Shoreham

Washington, D.C.

official event of Power Magazine

2026 Conference Agenda

The Data Center POWER eXchange agenda is structured around the actual decision points where the power industry and the data center industry meet: large-load tariff design, interconnection throughput, equipment slot allocation, behind-the-meter mechanics, ride-through standards, project-finance structuring, and federal proceedings that set the floor under all of them. Our single-track format reflects that same logic: when the decisions are interconnected, so is the program.

Wednesday, September 30
12:00 pm - 1:30 pm
Data Center POWER eXchange 2026
Keynote Session and Lunch
12:30 pm - 12:50 pm

The federal government has identified AI infrastructure and domestic energy production as national priorities, but translating policy direction into energized projects depends on permitting reform, transmission investment, and regulatory execution. A senior White House energy official opens DPX with a policy-level read on large-load development: which federal actions are underway, where coordination is affecting project timelines, and what utilities, developers, and data center customers should watch over the next 12 months.

Keynote
Peter Lake
CEO, former Sr Dir Power NEDC & Former Chairman of PUC TX
Cardinal Rose LLC
12:50 pm - 1:10 pm

Federal policy can set priorities, but regulatory sequencing will shape which large-load projects advance, where costs are assigned, and how quickly infrastructure can be built. Co-location reform, large-load tariff design, cost allocation, and regional transmission planning are moving through active FERC proceedings as utilities, developers, and hyperscalers make capital decisions. A senior regulator will address which decisions are on the commission's docket, what tradeoffs regulators are weighing, and how decision timing affects projects already in development.

Keynote
Judge Jehmal T. Hudson
Incoming NARUC President
Virginia State Corporation Commission
1:10 pm - 1:30 pm

AI load growth is forcing utilities and developers to translate semiconductor and data center trends into power demand forecasts. Higher rack densities, larger accelerator deployments, and the shift from training-heavy growth to broader inference workloads are changing where load appears, how concentrated it becomes, and how quickly sites move through planning. This briefing will connect chip and rack-level trends to delivered megawatts, explain why demand forecasts still vary widely, and identify the assumptions utilities and developers should test before committing capital.

Speaker
Alexander Hubbard
Technology Researcher
Lawrence Berkeley National Laboratory
1:45 pm - 2:25 pm
Data Center POWER eXchange 2026
Permitting in Practice: What's Actually Moving

Across the country, communities are taking a harder look at proposed data centers. Dozens of cities and counties have delayed, paused, or rejected projects over concerns about power demand, water use, noise, land use, and quality of life. What began in Northern Virginia has become a national trend, with high-profile debates unfolding in Texas, Georgia, Tennessee, Arizona, Ohio, and other fast-growing markets. Local officials — regardless of political affiliation — are imposing new requirements, considering moratoriums, and demanding greater community engagement and benefits before approving projects. This panel explores why community engagement is critical to data center development, separates fact from fiction on the drivers of opposition, examines the disputes shaping future policy, and discusses what actually changes stakeholder opinions and earns public trust.

Chair
Sean Lev
Partner
HWG LLP
Panelist
Robert M. Smith
Partner
K&L Gates
Panelist
Staci Pies
Senior Vice President of Government Relations and Policy
Incompas
2:25 pm - 3:05 pm
Data Center POWER eXchange 2026
Beyond the Permit: Earning Community Trust

Across the country, communities are taking a harder look at proposed data centers. Dozens of cities and counties have delayed, paused, or rejected projects over concerns about power demand, water use, noise, land use, and many other factors. What began in Northern Virginia has become a national trend, with high-profile debates unfolding in Texas, Georgia, Tennessee, Arizona, Ohio, and other fast-growing markets. Local officials—regardless of political affiliation—are imposing new requirements, considering moratoriums, and demanding greater community engagement and benefits before approving projects. This panel explores why community engagement is critical to data center development, separates fact from fiction regarding opposition drivers, examines the disputes shaping future policy, and discusses what actually changes stakeholder opinions and earns public trust.

Chair
Lisa Youngers
Head Public Policy & External Affairs
EdgeConneX
Moderator
Erin Ragsdale
EVP & Partner
Allyn
Panelist
Jarrett Lewis
Partner
Public Opinion Strategies
3:05 pm - 3:45 pm

Hyperscaler offtake is now the most bankable signal in the power sector — and the voluntary Ratepayer Protection Pledge has reset the baseline for what lenders expect. Traditional PPA-anchored project finance is still hitting walls. Build-and-transfer, multi-party ownership, and hybrid risk-allocation structures are emerging because credit committees want covenant packages, tenors, and contract terms that traditional PPA-based project finance was not built to handle at this scale. An economic consultant explains what lenders and equity actually require in 2026, while a developer and a utility examine the deal structures and take-or-pay terms now in market.

Moderator
Joel Fetter
Managing Director, Energy & Industrial Technologies
Clark Street Associates
Panelist
Robert Kaineg
Managing Director
FTI Consulting
Panelist
Patrick Klein
Managing Director, Project Finance - Americas
MUFG Bank - New York/US
Panelist
Joseph Dunfee
Principal, Investments
Expedition Infrastructure Partners
4:30 pm - 5:30 pm

Federal interconnection reform promised to cut timelines from seven years to closer to two. PJM has processed more than 300 GW of proposed generation since 2020 and signed interconnection agreements for about 103 GW — yet only 23 GW is in service. ERCOT, meanwhile, is managing hundreds of gigawatts of large-load requests with realization rates far below the volume of requests. For hyperscaler procurement and developers, the same question decides whether a 2027 or 2028 energization date is real, and how long they can wait before behind-the-meter options become the only credible backup. This session focuses on live cycle data: study throughput, withdrawals, network upgrade cost trends, and large-load prioritization.

Moderator
Zach Zimmerman
Director of Research and Policy
Grid Strategies
Panelist
Agee Springer
Director, Grid Interconnections
Electric Reliability Council of Texas (ERCOT)
Panelist
Jason P. Connell
Vice President Planning
PJM Interconnection
Panelist
Michael Hagerty
Principal
The Brattle Group
5:30 pm - 6:00 pm

AI-driven data center growth is straining the availability of transmission, gas turbines, reciprocating engines, and large power transformers, but those constraints are also changing how projects are planned. Utilities, developers, suppliers, and large-load customers are reassessing grid interconnection, on-site generation, modular deployment, fuel strategy, equipment reservations, and long-lead procurement. This panel will compare where bottlenecks are most acute, where alternative technologies and procurement models can create near-term options, and what project teams should evaluate before committing capital.

Panelist
Scott Young
Senior Business Development Manager
Wartsila North America, Inc.
Panelist
Orestes Macchione
Head of Sales - HVDC & Grid Access US
Siemens Energy, Inc.
6:00 pm - 7:00 pm
Thursday, October 1
8:00 am - 8:20 am
Data Center POWER eXchange 2026
The Utility's Honest Answer

Capital plans at several large U.S. utilities have stepped up sharply to serve data center corridors where contracted and requested load have surged over the last two years. The open question is how those utilities phase new generation, transmission, and distribution so they can serve committed projects without stranding assets if hyperscaler timelines slip or demand forecasts prove overstated — recent analysis suggests roughly 25 GW of potential double-counting in aggregated data center forecasts. In this keynote address, a senior utility executive lays out the numbers behind one utility's plan: how much capacity is tied to firm contracts, how much depends on requests that may not materialize, and what assumptions must hold for the build to make economic and regulatory sense.

Speaker
Edward Baine
Executive Vice President-Utility Operations and President-Dominion Energy Virginia
Dominion Energy, Inc.
8:20 am - 8:30 am
Data Center POWER eXchange 2026
The Hyperscaler's Actual Problem

Hyperscalers are committing capital on timelines that do not always match utility planning, regulatory review, or grid construction. This keynote gives the data center customer's position in direct terms as part of Day 2's three-part opening sequence. A senior hyperscaler energy leader explains what siting requirements, reliability standards, flexibility expectations, and contract structures have to look like before a large power commitment can be signed.

8:30 am - 9:00 am
Data Center POWER eXchange 2026
What Would It Actually Take to Sign?

This fireside closes Day 2's opening sequence by turning the two keynote perspectives into one concrete question: what would it actually take to move large-load demand from request to executed agreement? The discussion will examine how minimum payments, capacity commitments, cost recovery, flexibility expectations, and risk allocation show up in real contracts, and how each side thinks about moving from interest to a signable deal.

Moderator
Aaron Larson
Executive Editor
POWER magazine
Panelist
Edward Baine
Executive Vice President-Utility Operations and President-Dominion Energy Virginia
Dominion Energy, Inc.
9:00 am - 9:45 am
Data Center POWER eXchange 2026
How Big is Big? Demand at Scale

AI load has generated a wave of federal policy, utility pledges, and state cost-allocation agreements. The demand forecasts driving all of it are still in dispute. Speed-to-power has become a governing pressure, but utilities, regulators, developers, and communities still have to decide how much AI-driven load is real, how quickly it will arrive, what infrastructure it requires, and who pays if the forecast is wrong. This panel puts demand modeling, grid planning, public-power cost allocation, AI-first infrastructure, and colocation development in one conversation: what does the next decade of build look like under current commitments—and where do the assumptions begin to fail?

Moderator/Chair
Claire Gauthier
Exec VP & Global Head Energy & Utilities
Capgemini
Panelist
Latif Nurani
Senior Regulatory Counsel
American Public Power Association
Panelist
Phillip R. May
President & CEO
Entergy Louisiana, LLC
Panelist
Michael Nudelman
Chief Development Officer
Iren
9:45 am - 10:30 am
10:30 am - 11:00 am
Data Center POWER eXchange 2026
GE Vernova Fireside
Keynote
Jason Reagan
Executive
GE Vernova
11:00 am - 12:00 pm

Gas, nuclear, and geothermal face different realities on permitting, equipment, financing, and time to commercial operation. Gas is already being built for data center load but runs into turbine slot backlogs, siting fights, and air permits. Advanced reactor projects are moving through new licensing paths and have strong bipartisan policy support, yet first-of-a-kind execution and financing still push most commercial-operation dates into the 2030s. Enhanced geothermal has a handful of scaled projects and project-finance precedent. This session asks what each of these technologies can credibly do for data-center-driven firm load over the next decade and under what conditions.

Panelist
Marcus Nichol
Vice President, Nuclear Deployment & Fuel Cycle
Nuclear Energy Institute (NEI)
Panelist
Stephen J. Humes
Partner, Energy Projects
Pillsbury Winthrop Shaw Pittman LLP
12:00 pm - 1:30 pm

The POWER eXchange Roundtables move the hardest questions into cross-sector discussion. Seating is assigned so utilities, hyperscalers, developers, financiers, regulators, and community stakeholders are not talking only to themselves. Three moderated tables will focus on: commercial structures and cost allocation, technical questions around interconnection and grid integration, and stakeholder issues including community acceptance and permitting. Format is designed for operational candor on issues central to whether projects move.

1:30 pm - 2:30 pm

Bring-your-own-power strategies have moved from contingency plan to active option for large data center loads facing interconnection delays, tariff uncertainty, and equipment bottlenecks. Multi-gigawatt programs pairing data centers with dedicated gas and fuel-cell capacity are already in deployment, and recent federal co-location and behind-the-meter reforms are poised to reshape the economics for some projects. This session examines the full BYOP/BTM decision: under current queue timelines, cost-allocation and tariff structures, co-location rules, fuel-supply and pipeline firmness, emissions and permitting obligations, and day-to-day operating duties — when does it make sense to secure your own on-site power, and when is a grid-served arrangement still the better choice?

Moderator
Arjun Prasad Ramadevanahalli
Partner
Morgan, Lewis and Bockius, LLP
Panelist
TJ Surbella
Power IBU Director
Emerson Power & Water Solutions
Panelist
Nicole Bulgarino
Co President
Ameresco Inc.
2:30 pm - 3:00 pm
Data Center POWER eXchange 2026
Stabilizing the Grid: A Four-Way Comparison

AI-scale loads are changing grid-stability requirements. Fast-switching, high-density data center loads can create voltage, frequency, and ride-through challenges that traditional commercial load planning did not anticipate. This session compares four approaches to stabilizing systems under large-load growth: synchronous condensers, advanced storage, supercapacitors, and algorithmic load control. A utility grid operations executive evaluates each option from the buyer's perspective. The format is structured to avoid product pitches and focus on use case, cost, deployment readiness, and operational fit.

Panelist
Holt Bradshaw
Principal Consultant
Siemens AG PTI Consulting
Panelist
Mark G. Lauby
Chief Engineer and Fellow
North American Electric Reliability Corporation (NERC)
Panelist
Dr. Daniel Wilson
Technical Staff
Emerald AI
3:00 pm - 3:30 pm
Data Center POWER eXchange 2026
Flex Mosaic in Practice

Data centers are not typically flexible loads. Today, about a gigawatt of contracted data center flexibility is in place across multiple U.S. utilities.  This flexible capacity has the potential to expand in the future because of EPRI's DCFlex work with hyperscalers, utilities, technology providers, system operators and data center developers. Over the last two years, DCFlex developed a framework, called Flex MOSAICTM, that provides a common language for flexibility in the data center industry. The DCFlex initiative has also tested how far that flexibility can go. This briefing presents an overview of the Flex MOSAIC classification framework, potential applications of the framework and evidence from DCFlex's in-production demonstrations.

Panelist
Jessica Lin
Technical Executive
EPRI Electric Power Research Institute
Panelist
Parag Mitra
Sr Principal Technical Leader
EPRI Electric Power Research Institute
3:30 pm - 4:00 pm
4:00 pm - 5:00 pm

DPX closes with the organizations whose members must live with the outcomes: utilities, data center operators, generation developers, nuclear advocates, and clean-energy buyers. After two days of constraint analysis, this discussion asks where the industry has credible momentum and where risk is still being understated. Which permitting battles are winnable? Which queues are realistic? Which cost-allocation fights could kill deals that appear viable? Which technologies are moving from promise to execution?

Moderator
Hon. Mark W. Menezes
President & Chief Executive Officer
United States Energy Association (USEA)
Panelist
Rich Powell
CEO
Clean Energy Buyers Association (CEBA)
Panelist
Todd Snitchler
President & CEO
Electric Power Supply Association (EPSA)
Panelist
Marcus Nichol
Vice President, Nuclear Deployment & Fuel Cycle
Nuclear Energy Institute (NEI)
Panelist
Rachael Marsh
Chief Legal Officer
Edison Electric Institute
5:00 pm - 6:00 pm

Group Show Director

Marisa Nicholson

mnicholson@accessintel.com

Event Sales Director

Ellen Nyboer

enyboer@accessintel.com

Sr. Marketing Director

Nikki Puckett

npuckett@accessintel.com

Content Director

Cassie Davie

cdavie@accessintel.com

Sr. Editor, POWER

Sonal Patel

spatel@powermag.com